{"id":61885,"date":"2025-08-28T15:12:43","date_gmt":"2025-08-28T15:12:43","guid":{"rendered":"https:\/\/kede.com.br\/news\/work-to-build-500-steel-pylons-to-create-70-jobs-in-east-lothian\/"},"modified":"2025-08-28T15:12:44","modified_gmt":"2025-08-28T15:12:44","slug":"work-to-build-500-steel-pylons-to-create-70-jobs-in-east-lothian","status":"publish","type":"post","link":"https:\/\/kede.com.br\/news\/work-to-build-500-steel-pylons-to-create-70-jobs-in-east-lothian\/","title":{"rendered":"Work to build 500 steel pylons to create 70 jobs in East Lothian"},"content":{"rendered":"<p> <br \/>\n<\/p>\n<div data-component=\"text-block\">\n<p class=\"sc-9a00e533-0 hxuGS\">Work to build 500 steel pylons for overhead electricity lines will create 70 jobs in East Lothian.<\/p>\n<p class=\"sc-9a00e533-0 hxuGS\">It is part of energy firm SSEN Transmission&#8217;s project to upgrade the electricity grid across the north of Scotland.<\/p>\n<p class=\"sc-9a00e533-0 hxuGS\">The pylons, which will be made by Tranent-based firm Had-Fab, will be used in the <a target=\"_blank\" href=\"https:\/\/www.ssen-transmission.co.uk\/projects\/project-map\/spittal--loch-buidhe--beauly-400kv-connection\/\" class=\"sc-f9178328-0 bGFWdi\" rel=\"noopener\">proposed new powerline<\/a> between Spittal in Caithness, in the far north of Scotland, to Beauly, near Inverness.<\/p>\n<p class=\"sc-9a00e533-0 hxuGS\">The plans are seen as critical in moving renewable energy generated in the Highlands to the rest of the UK.<\/p>\n<\/div>\n<div data-component=\"text-block\">\n<p class=\"sc-9a00e533-0 hxuGS\">In the last 18 months, Had-Fab has increased its workers from 120 to 197, with most based in East Lothian.<\/p>\n<\/div>\n<div data-component=\"text-block\">\n<p class=\"sc-9a00e533-0 hxuGS\">SSEN Transmission plans to upgrade an overhead line near Spittal in Caithness to near Beauly, about 12 miles (19km) west of Inverness.<\/p>\n<p class=\"sc-9a00e533-0 hxuGS\">The length of the line is planned to cover about 106 miles (170km) &#8211; carried by steel pylons about 187ft (57m) tall.<\/p>\n<p class=\"sc-9a00e533-0 hxuGS\">The overall value of the pylon work will be more than \u00a3100m &#8211; the largest award in Had-Fab&#8217;s history.<\/p>\n<p class=\"sc-9a00e533-0 hxuGS\">Anthony Jones, chief commercial officer of Had-Fab: &#8220;These contracts reflect the continuing trust placed in Had-Fab&#8217;s capabilities and the strength of our commitment to innovation, sustainability, and engineering excellence.&#8221;<\/p>\n<p class=\"sc-9a00e533-0 hxuGS\">Scottish Secretary Ian Murray said: &#8220;This is great news for our country&#8217;s clean power ambitions, and for more skilled jobs in here in Scotland.<\/p>\n<p class=\"sc-9a00e533-0 hxuGS\">&#8220;This work is critical to unlocking Scotland&#8217;s vast renewable energy potential.&#8221;<\/p>\n<p class=\"sc-9a00e533-0 hxuGS\">Rob McDonald, managing director of SSEN Transmission, said: &#8220;The scale of this work secured by Had-Fab demonstrates the major economic opportunities that are generated by investing to upgrade our electricity transmission infrastructure.&#8221;<\/p>\n<\/div>\n<p><br \/>\n<br \/><a href=\"https:\/\/www.bbc.com\/news\/articles\/cy0qzppvekko?at_medium=RSS&#038;at_campaign=rss\">Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Work to build 500 steel pylons for overhead electricity lines will create 70 jobs in East Lothian. It is part of energy firm SSEN Transmission&#8217;s project to upgrade the electricity grid across the north of Scotland. The pylons, which will be made by Tranent-based firm Had-Fab, will be used in the proposed new powerline between [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":61886,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[49],"tags":[1087,3598,140,771,2248,12666,4240,81],"_links":{"self":[{"href":"https:\/\/kede.com.br\/news\/wp-json\/wp\/v2\/posts\/61885"}],"collection":[{"href":"https:\/\/kede.com.br\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/kede.com.br\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/kede.com.br\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/kede.com.br\/news\/wp-json\/wp\/v2\/comments?post=61885"}],"version-history":[{"count":1,"href":"https:\/\/kede.com.br\/news\/wp-json\/wp\/v2\/posts\/61885\/revisions"}],"predecessor-version":[{"id":61887,"href":"https:\/\/kede.com.br\/news\/wp-json\/wp\/v2\/posts\/61885\/revisions\/61887"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/kede.com.br\/news\/wp-json\/wp\/v2\/media\/61886"}],"wp:attachment":[{"href":"https:\/\/kede.com.br\/news\/wp-json\/wp\/v2\/media?parent=61885"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/kede.com.br\/news\/wp-json\/wp\/v2\/categories?post=61885"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/kede.com.br\/news\/wp-json\/wp\/v2\/tags?post=61885"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}